Working on the foundation (2008)

by Dave Sullivan
One of the first steps in deciding how to expand and improve the cabin
was to determine whether the foundation would support an expanded second
floor.
September 9-10, 2008


 |
Top: For
years it has been almost impossible to get under the front half of the cabin.
The access hole is under the kitchen sink, so you needed to snake your body
around the kitchen drain pipes to get under the cabin. Then we built the deck,
and that access hole became nearly impossible to use. To improve this situation,
I removed 26-inches of foundation from the north side of the cabin. Now it is
far easier to get in.
Middle: Most people won't find this photo as exciting as I felt when I
took it. I was hoping Dad had put bolts into the foundation to tie the cabin to
the concrete -- and here they were. He put them on 6-foot spacing along the
front wall, and right at the corners of the side wall.
Bottom: There isn't a lot of room to maneuver under the cabin, but it can
be done. I will be able to fish insulation in and pack it between the floor
joists. This should make the cabin warmer in the winter. Also, if you look very
carefully, you can see another tie-down bolt in a pocket that Dad cut into the
rim joist along the front wall. |
September 20-21, 2008

 |
Top: Barb helped me
install insulation. She cut the fiberglass batts to length and stuffed them
under the cabin. Then I (Dave Sullivan), used a nail gun and wood lath to hold
the insulation in place. Although it was dry on Saturday, it rained on Sunday. I
stayed dry under the cabin ... Barb was outside helping and got all wet.
Bottom: I decided we needed more crawl space under the cabin, and that
involved digging with the fireplace shovel (because it was small and worked well
in tight places) and loading up a wooden sled. Then Barb would pull out the sled
and dump it ... and I would load it up again. Since this was hard, dirty work
... it left Barb's feet rather muddy. |

 |
Top: Installing fiberglass insulation. You can see my leg on the
left and the nail gun.
Bottom: This shows what the finished job looks like. Notice the 6-mill,
black plastic ground cover. The insulation is held in place by wood lath and
galvanized finish nails. In the background, you can see the kitchen sink drain.
It heads downhill for a while, and then it goes up-hill again!!! Obviously it
needs some support in the middle, and I have no idea why it still works. |
|